Veer Buildhouse: Construction

Hot

Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

Saturday, May 31, 2025

Septic Tank/ सेप्टिक टैंक बनवाने से पहले ये 25 बातें ध्यान रखे! 25 septi...

10:52 PM 0

                       सेप्टिक टैंक बनवाने से पहले ये बातें ध्यान रखे


सेप्टिक टैंक एक भूमिगत, पानी-रोधी कंटेनर है जो घरेलू अपशिष्ट जल को जमा करके और उसका प्राथमिक उपचार करता है। यह एक प्रकार का छोटा सीवेज उपचार संयंत्र है जो ग्रामीण क्षेत्रों में और उन घरों में प्रयोग किया जाता है जहाँ सीवर नेटवर्क नहीं है. सेप्टिक टैंक आमतौर पर कंक्रीट, फाइबरग्लास या पॉलीइथिलीन से बने होते हैं. 

 

IS 2470: 1985

 

 It is divided into two parts:

Part 1 deals with design criteria and construction,

Part 2 focuses on secondary treatment and disposal of septic tank effluent. 

 

I. Site Selection and Planning:

II. Tank Design and Materials:

III. Construction Practices:

 

I. Site Selection and Planning:

·         Suitable Location:

·         Downhill from the house and away from water sources (well, etc.). 

·         At least 15m (50ft) from the nearest water supply. 

·         3m (10ft) from the nearest building. 

·         Avoid areas prone to flooding or where vehicles might drive over the tank. 

              Draw a Plan:

·         Show the septic tank's location relative to the house, property lines, and water sources. 

·         Include ground slope and any other relevant features. 

              Soil Testing:

·         Determine the soil type and permeability for proper drainfield design. 

              Permeability Test:

·         Test the soil's ability to absorb water to ensure proper effluent drainage. 

II. Tank Design and Materials:

·         Tank Capacity:

·         Calculate the required tank volume based on daily water usage and sludge storage. 

·         Ensure adequate sludge and scum storage. 

              Two Compartments:

·         The primary compartment should be larger than the secondary. 

·         Partition wall with an opening between compartments. 

              Inlet and Outlet Pipes:

·         Use T-pipes to avoid solids entering the drainfield. 

·         Ensure proper venting of the septic tank. 

              Tank Material:

·         Use reinforced concrete, concrete blocks, or other suitable materials. 

·         Ensure the tank is watertight and structurally sound. 

              Sewer Line:

·         Use non-corrosive, hardwearing material like concrete or plastic. 

·         Ensure proper slope and grade for wastewater flow. 

III. Construction Practices:

·         Digging and Excavation:

o    Ensure proper depth and size for the tank and drainfield. 

·         Concrete Pouring:

o    Use high-quality concrete mix and ensure proper curing. 

·         Tank Installation:

o    Follow design specifications for placement and connections. 

·         Drainfield Installation:

o    Ensure proper spacing and depth of perforated pipes. 

·         Vent Pipe Installation:

o    Extend vent pipe above the roof to allow for gas escape. 

·         Testing and Inspection:

o    Conduct a watertightness test and ensure proper connections. 

o    Inspect for leaks or damage during construction. 

IV. Maintenance and Monitoring:

·         Sludge Pumping:

o    Regularly pump out sludge to maintain tank capacity.

·         Drainfield Inspection:

o    Monitor for signs of clogging or failure.

·         Vent Pipe Inspection:

o    Ensure the vent pipe is free of obstructions. 

V. Safety and Compliance:

·         Local Codes and Regulations:

o    Adhere to all local and state regulations for septic systems.

·         Permits:

o    Obtain necessary permits before starting construction.

·         Safety Precautions:

o    Take necessary safety precautions during construction and maintenance. 


Read More

Tuesday, October 1, 2024

Monday, September 9, 2024

Slab ढलाई में ध्यान रखने योग्य बातें | Checklist For Rcc slab casting # ...

12:37 PM 0
                 CHECKLIST FOR RCC SLAB AND BEAMS




1.Beam bottom's line, level & width should be checked.
2 Beam side's line, level & plumb should be checked.
3 Beam to beam measurements shall be checked as per architectural drawings
4 Individual level & diagonall of each slab bay shall be checked.
5 Slab thickness level shall be marked with nails on the peripheral beam's outer sides.
6 Slab thickness & beam depths should be checked .
7
Support props for slab & beam bottoms should be in line & plumb. Bamboo bracing should be done at around 4' ht from floor
level. Support props for double staging terraces shall be carefully checked.
8
CHECKLIST FOR RCC SLAB AND BEAMS
Line of external /peripheral beam's sides shall be checked & should be cross supported to avoid buldging out of sides.
9 Junctions of columns & beam shall be checked so that they are watertight.
10 Deshuttering oil shall be applied to beam/slab shuttering.
11 Formwork of stairacse shall be checked for dimensions of tread and riser, level of treads, plumb of risers.
12 Reinforcement shall be checked for beams and slab as per R.C.C drawing
13 Proper cover for bottom /sides shall be checked for beams.
14 Proper cover shall be checked for slab.
15 Electrical points ,electrical piping (conduits)/fan hooks shall be checked as per drawing.
16 Reduction of column as per drawing shall be done if any.
17 Proper number of chairs shall be provided for slab.
18 Dowels (if any) required to be provided for elevational feaures / future extentions.
19 Parapet (Pardi) bars shall be left for balconies/staircase etc.
20 Ring (stirrups) shall be provided at the free end of each column reinforcement.
21 Gaps between plates /planks should be filled. Taping should be done at ply joints in care of ply shuttering.
22
24 Approval of architect and R.C.C Consultant shall be taken prior to pouring.
25 Check the availability of required labour strength, mixer, lift, vibrators, masons, weigh batcher, diesel/petrol and plastic sheets
etc before start of concreting.
26 Hidden beams /inverted beams/cantilever beams should be checked.
27 Check for the sunk if any as per the approved drawings.
28 Packing below support props should be avoided. If not , single wooden plank should be inserted as packing.
29 In case of large slabs , position of concrete joints shall be decided in advance as per approval by RCC consultant.
30
Availibility of raw material for concrete /RMC per grade of concrete , water , electricity shall be checked in advance before the
start of concreting.
31 Concreting shall be done for the beams first & then slabs.
32 Compaction of concrete shall be done by vibrators & tamping rods.
33
The top level of the slab shall be finished by mason & no one should be allowed to walk on the fresh finished concrete.
34 Carpenter shall be present below the slab shuttering during concreting to ensure the tightners of the form work.
35 In case of rains , the finished concrete shall be covered with big plastic sheets.
36 Cast 6 cube moulds for testing .
37 Curing of slab shall be done with ponding method by making ponds in cement & sand mortar (1:10) of size around 5' X 5'. Curing
of beams and slabs shall be done for 7 to 10 days or as directed by the consultant.
38
Deshuttering of the beam outer sides can be done after 24 hours . Deshuttering of the beam inner sides can be done after 48
hours . Deshuttering of the beam bottoms can be done after 14 days for beam lengths upto 3 M or as directed by the consultant
. Deshuttering of the slab can be done after 7 days for slabs upto 3 M span or as directed by the consultant.
39 Finishing of honeycomb shall be done with proper care in front of engineer the next day.
40 Hacking of the beam sides, beam bottoms, slab bottoms shall be done within 1 or 2 days from deshuttering.
41 Date of casting and slab no shall be painted on the front side beam
Read More

Tuesday, August 20, 2024

modern farmhouse | small farmhouse design

8:41 PM 0
modern farmhouse



modern farmhouse,
small farmhouse design,
modern farmhouse kitchen,
modern farmhouse tour,
modern farmhouse home plans,
modern farmhouse living room,
modern farmhouse home tour,
modern farmhouse house plans,
modern farmhouses,
modern farmhouse homes,
modern farmhouse design,
modern farmhouse decor,
modern farmhouse style,
modern farmhouse plans,
modern farmhouse,
Read More

Sunday, August 11, 2024

house interior steps after civil work | interior design

25 x 50 square feet house plan ! 25 x 50 house plans india ! 25 x 50 dup...

2:27 AM 0
25 x 50 square feet house plan ! 25 x 50 house plans india ! 25 x 50 duplex house plans ! house plan




25 x 50 square feet house plan
25 x 50 house plans india
25 x 50 duplex house plans
house plans
25x50 house plan
house plans
25x50 house design
25 x 50 house plan
25*50 house plan duplex
25*50 house plan 3bhk
25*50 house plan west facing
25 by 50 ka naksha
25*55 house map
25x50 house plan west facing
25*50 house plan south facing
25*57 house map
Read More

Friday, August 9, 2024

30x50 house plans 3 bedroom | 30x50 best house plan | home design | ghar...

11:00 PM 0

30x50 house plans 3 bedroom | 30x50 best house plan | home design



house design
30 by 50 house plan
30x50 3d house plan
30x50 house plan 3d
30x50 duplex house design,
30x50 house plans
30*50 house plan with vastu
house plans
30*50 house plan with car parking
30x50 house plans 3d
30 x 50 sqft house plan
1500 sqft house plan
30 x 50 house plan
1500 sqft ghar ka naksha
30 by 50 ka naksha
30x50 house plan
metal building
30x50 house design
30 x 50 ghar ka naksha
30x50 house plans 3 bedroom
metal garage building
30 x 50 house plans east facing
30 x 50 house
30x50
Read More

Thursday, August 8, 2024

32 x 36 ghar ka naksha | 32 x 36 house design | 1200 sq ft duplex house ...

5:58 PM 0
32 x 36 ghar ka naksha | 32 x 36 house design | 1200 sq ft duplex house | home design





32 x 42 house plan
1280 sqft,
32 x 40 ghar ka design
1280 sqft ghar ka design
32 x 40 house design
32 by 40 ka naksha
32*40 house design
house
32x40 house plan
32 x 40 home design
1200 sqft
32x40 ghar ka naksha
gopal architecture
32*40 house plan west facing
32x40 house floor plans
32 x 40 ghar ka naksha
32 x 40 house plan
32x40 house design
32 x 36 house plan
40 x 32 house plans
32 x 40 house plans
32 x 36 house design
32x40 house plans
30 x 40 feet house plan
vastu plans
32 x 40 house plan by gopal
2 bedroom house
house plans
home design
32*40 house plan
garage build
32 by 40 house plans
35 x 40 house plan
house design
small house
4 bedroom simple house plan
Read More